The Drilling Rigs Schedule was born out of the need to control one of the most expensive and expensive resources in the oil industry. The oil drilling rig are features of slow locomotion and daily high cost, even while traveling to its destination.
The idea behind the timeline was to manage these resources in a way that optimized their travel and usage, thereby reducing the cost to the company, as well as centralizing long-term planning.
The project began as a Siplex module, but after a few years it grew in size, complexity and importance, making it an enterprise system that shares data with Siplex.
 |
Drilling Rigs Schedule - ForUs interface |
The interface is web with drag and drop capabilities to position the wells on their respective oil drilling rig.
I have been in the project since its creation and I participated in creating and defining the layout of the application until his exit from the Siplex team.
Due to the values involved in the system, it is considered an important system for the
Petrobras business.
For legal reasons, interfaces can not be readable.
Project start year: 2007 and still in development
Duration: 1 year and a half
Position: System Analyst, Senior System Analyst, Consultant
Role: Developer, Designer, Front-end
Working for:
Atos Origin,
Accenture
Client:
Petrobras
Technologies:
Asp.net MVC 3,
Css3,
HTML 5,
Bootstrap,
Oracle,
TFS,
Linq,
C# .Net,
Adobe Photoshop,
jQuery,
Script.aculo.us,
Node.JS,
jQuery UI,
ForUs,
Java,
Json
0 comments:
Post a Comment